Minutes
EAST SUSSEX COUNTY COUNCIL
MINUTES of a MEETING of the EAST SUSSEX COUNTY Council held at Council Chamber, County Hall, Lewes on 8 February 2022at 10.00 am
Present |
Councillors Sam Adeniji, Abul Azad, Matthew Beaver, Colin Belsey, Nick Bennett, Bob Bowdler, Charles Clark, Chris Collier, Godfrey Daniel, Johnny Denis, Penny di Cara, Chris Dowling, Claire Dowling, Kathryn Field, Gerard Fox, Roy Galley (Vice Chairman), Nuala Geary, Keith Glazier, Alan Hay, Julia Hilton, Ian Hollidge, Stephen Holt, Johanna Howell, Eleanor Kirby-Green, Carolyn Lambert, Tom Liddiard, Philip Lunn, James MacCleary, Wendy Maples, Sorrell Marlow-Eastwood, Carl Maynard, Matthew Milligan, Sarah Osborne, Peter Pragnell (Chairman), Paul Redstone, Christine Robinson, Pat Rodohan, Phil Scott, Daniel Shing, Stephen Shing, Alan Shuttleworth, Rupert Simmons, Bob Standley, Colin Swansborough, Barry Taylor, Georgia Taylor, David Tutt, John Ungar and Trevor Webb |
46. Minutes of the meeting held on 7 December 2021
46.1 RESOLVED – to confirm as a correct record the minutes of the County Council held on 7 December 2021 as a correct.
47. Apologies for absence
47.1 An apology for absence was received on behalf of Councillor Steve Murphy.
48. Chairman's business
NEW YEAR’S HONOURS
48.1 On behalf of the Council, the Chairman congratulated all those who live or work in East Sussex who were recognised in the New Year’s Honours including Roger Cohen, a Trading Standards Officer, who was awarded an MBE for services to the RNLI.
CHAIRMAN’S ACTIVITIES
48.2 The Chairman reported that he had attended one engagement since the last meeting of the Council - the Year 8 achievement celebration at Ark Alexandra Academy in Hastings. The Chairman thanked the Vice Chairman for his ongoing support.
PETITIONS
48.3 The following petitions were presented before the meeting by Councillors:
Councillor Galley |
- calling on the County Council to reduce the speed limit on the A22 from Cackle Street to Lampool Roundabout |
Councillor Hilton |
- calling on the County Council to implement a walking and cycling route in Alexandra Park, Hastings |
Councillor Georgia Taylor |
- calling on the Council to implement traffic calming measures on the A26 at Eridge Green |
PRAYERS
48.4 The Chairman thanked the Father David Hill for leading prayers before the meeting.
49. Questions from members of the public
49.1 Copies of a question from a member of the public and the answer from Councillor Claire Dowling (Lead Member for Transport and Environment) are attached to these minutes.
50. Declarations of Interest
50.1 There were no declarations of interest.
51. Reports
51.1 The Chairman of the County Council, having called over the reports set out in the agenda, reserved the following for discussion:
Cabinet report – paragraph 1 (Reconciling Policy, Performance and Resources), paragraph 3 (Annual Progress report for Looked After Children’s Services) and paragraph 4 (Treasury Management Policy and Strategy 2022/23)
NON-RESERVED PARAGRAPHS
51.2 On the motion of the Chairman of the County Council, the Council adopted those paragraphs in reports that had not been reserved for discussion as follows:
Cabinet report – paragraph 2 (Council monitoring quarter 2)
52. Report of the Cabinet
Paragraph 1 – Reconciling Policy Performance and Resources
52.1 Under Standing Order 23, the Council agreed that the speeches of the Leaders of the 5 Groups (or their nominees) on paragraph 1 of the Cabinet’s report be extended beyond 5 minutes.
52.2 Councillor Bennett moved the adoption of paragraph 1 of the Cabinet’s report.
52.3 The following amendment (from the Liberal Democrat, Labour, Green and Independent Democrat Groups) was moved by Councillor Tutt and seconded:
Delete paragraph 1.66 of the Cabinet’s report and replace with:-
(1) approve, in principle, the draft Council Plan 2022/23 at Appendix 1 and authorise the Chief Executive to finalise the Plan in consultation with the relevant Lead Members;
(2) approve the net Revenue Budget estimates totalling £453.2m for 2022/23 as set out on Appendix 2 (Medium Term Financial Plan) and 3 (Budget Summary) and authorise the Chief Executive, in consultation with the Chief Finance Officer, Leader and Deputy Leader, to make adjustments to the presentation of the Budget Summary to reflect the final settlement and budget decisions with the following amendments:
1. To use £4,126,000 of the revenue surplus on: -
a. Ringfence investment in Vehicle Activated Signage (VAS) Units to tackle the widespread problems of speeding across the County (at £200,000 per year for 3 years) - £600,000
b. Ringfence further investment in pavements and dropped curbs (at £100,000 per year for 4 years – managed within the capital programme) - £400,000
c. Comprehensive programme of training for all teachers and education professionals to address concerns about Mental Health and other health issues arising from the pandemic and lockdowns - £750,000
d. Community Action Programmes aimed at countering youth offending, particularly drug crime - £425,000
e. Pilot a retrofit scheme to demonstrate the comprehensive benefits of retro fitting property - £450,000
f. Ongoing re-investment in I-Send EHCP Assessment Service for 2022/23 and future years - £188,000
g. Bollards - accelerate replacement of keep left lights with reflectors, including maintenance costs - £250,000
h. Carers – provision of extra sessions of respite care, training for new carers and for young carers and development of new County App for carers to give easy access to information sources and to each other - £580,000
i. Community Match Funding – for 2022/23, pilot a reduced external match requirement to 25% - £100,000
j. Biodiversity – Pilot the development of a 50% Council match funded scheme for local biodiversity and habitat initiatives (£100,000 per year for 2 years) - £200,000
k. Use Libraries savings in 2022/23 to invest in book stock - £183,000 (and removal of all £288,000 savings currently in the Medium Term Financial Plan by 2023/24)
2. One-off investment from the Market Sustainability and Fair Cost of Care Fund (MSFCCF) to review, research and identify innovative models of home care with a view to producing a business case and budget proposal for 2023/24 - £100,000
3. Use the existing Economic Intervention Fund to conduct and support feasibility work for pump priming and stimulating the Community Energy Sector - £100,000
4. Bring forward capital allocation from Local Cycling and Walking Infrastructure Plans (LCWIP) to focus on the development of pipeline schemes - £100,000
5. Investment in Road Safety infrastructure providing more crossings - £1,750,000
Total of proposed revenue amendments - £6,176,000
To be funded by:
6. Use of 2022/23 revenue surplus - £4,126,000
7. One off top slice from the MSFCCF - £100,000
8. One off use of Economic Intervention Fund - £100,000
9. Capital investment brought forward - £100,000
10. 2022/23 Service Grant set aside for investment opportunities - £1,750,000
Total of proposed revenue funding amendments - £6,176,000
(3) in accordance with the Local Government Finance Act 1992 to agree that:
(i) the net budget requirement is £453.2m and the amount calculated by East Sussex County Council as its council tax requirement (see Appendix 5) for the year 2022/23 is £328.4m;
(ii) the amount calculated by East Sussex County Council as the basic amount of its council tax (i.e. for a band D property) for the year 2022/23 is £1,613.34 and represents a 4.49% (2.5% of which relates to the Adult Social Care precept) increase on the previous year;
(4) advise the District and Borough Councils of the relevant amounts payable and council tax in other bands in line with the regulations and to issue precepts accordingly in accordance with an agreed schedule of instalments to be revised as amended by proposals in paragraph (2) above;
(5) note the fees and charges set out in Appendix 9 that have been increased above inflation;
(6) approve the Capital Strategy and Programme as set out at Appendix 8;
(7) note the progress with the Council Plan and Budget 2021/22 since quarter 2 set out in paragraphs 1.34 to 1.37 of the report;
(8) note the Medium Term Financial Plan forecast for the period 2022/23 to 2024/25 as set out in Appendix 2 and amended by the proposals in paragraph (2) above;
(9) note the comments of the Chief Finance Officer on budget risks and robustness as set out in Appendix 6;
(10) note the comments from the engagement exercises as set out in Appendix 7.
(11) agree the Reserves Policy set out at Appendix 6; and
(12) approve the transfer of:
· £3.425m of the remaining one-off Service Grant funding to the Priority Outcomes and Transformation reserve for one-off investment in programmes that meet the Council’s priority outcomes;
· £1.645m Market Sustainability and Fair Cost of Care Fund and £3.1m Adult Social Care precept to Adult Social Care to support costs arising from national social care reforms, with any unused funding in year to be transferred to a new Adult Social Care Reform reserve.
52.4 A recorded vote on Opposition Groups amendment proposed by Councillor Tutt was taken. The amendment was LOST, the votes being cast as follows:
FOR THE AMENDMENT
Councillors Collier, Daniel, Denis, Field, Hilton, Holt, Lambert, MacCleary, Maples, Osborne, Robinson, Rodohan, Scott, Daniel Shing, Stephen Shing, Shuttleworth, Swansborough, Georgia Taylor, Tutt, Ungar and Webb.
AGAINST THE AMENDMENT
Councillors Adeniji, Azad, Beaver, Belsey, Bennett, Bowdler, Clark, di Cara, Chris Dowling, Claire Dowling, Fox, Galley, Geary, Glazier, Hay, Hollidge, Howell, Kirby-Green, Liddiard, Lunn, Marlow-Eastwood, Maynard, Milligan, Pragnell, Redstone, Simmons, Standley and Barry Taylor.
ABSTENTIONS
None
52.5 The following motion was moved by Councillor Bennet to adopt paragraph 1 of the Cabinet report:
(1) approve, in principle, the draft Council Plan 2022/23 at Appendix 1 and authorise the Chief Executive to finalise the Plan in consultation with the relevant Lead Members;
(2) approve the net Revenue Budget estimate of £453.2m for 2022/23 as set out in Appendix 2 (Medium Term Financial Plan) and Appendix 3 (Budget Summary) and authorise the Chief Executive, in consultation with the Chief Finance Officer, Leader and Deputy Leader, to make adjustments to the presentation of the Budget Summary to reflect the final settlement and budget decisions;
(3) in accordance with the Local Government Finance Act 1992 to agree that:
(iii) the net budget requirement is £453.2m and the amount calculated by East Sussex County Council as its council tax requirement (see Appendix 5) for the year 2022/23 is £328.4m;
(iv) the amount calculated by East Sussex County Council as the basic amount of its council tax (i.e. for a band D property) for the year 2022/23 is £1,613.34 and represents a 4.49% (2.5% of which relates to the Adult Social Care precept) increase on the previous year;
(4) advise the District and Borough Councils of the relevant amounts payable and council tax in other bands in line with the regulations and to issue precepts accordingly in accordance with an agreed schedule of instalments as set out at Appendix 5
(5) agree the Reserves Policy set out in Appendix 6;
(6) approve the transfer of:
· £5.175m one-off Service Grant funding to the Priority Outcomes and Transformation reserve for one-off investment in programmes that meet the Council’s priority outcomes;
· £1.745m Market Sustainability and Fair Cost of Care Fund and £3.1m Adult Social Care precept to Adult Social Care to support costs arising from national social care reforms, with any unused funding in year to be transferred to a new Adult Social Care Reform reserve.
(7) approve the Capital Strategy and Programme at Appendix 8;
(8) note progress with the Council Plan and Budget 2021/22 since quarter 2 set out in paragraphs 1.34 to 1.37 of the report;
(9) note the Medium Term Financial Plan forecast for 2022/23 to 2024/25, set out in Appendix 2;
(10) note the comments of the Chief Finance Officer on budget risks and robustness, as set out in Appendix 6:
(11) note the comments from engagement exercises set out in Appendix 7; and
(12) note the schedule of fees and charges that have increased above inflation at Appendix 9.
52.6 A recorded vote was taken on the motion moved by Councillor Bennett. The motion was CARRIED with the votes being cast as follows: as follows:
FOR THE MOTION
Councillors Adeniji, Azad, Beaver, Belsey, Bennett, Bowdler, Clark, di Cara, Chris Dowling, Claire Dowling, Fox, Galley, Geary, Glazier, Hay, Hollidge, Howell, Kirby-Green, Liddiard, Lunn, Marlow-Eastwood, Maynard, Milligan, Pragnell, Redstone, Simmons, Standley and Barry Taylor.
AGAINST THE MOTION
None
ABSTENTIONS
Councillors Collier, Daniel, Denis, Field, Hilton, Holt, Lambert, MacCleary, Maples, Osborne, Robinson, Rodohan, Scott, Daniel Shing, Stephen Shing, Shuttleworth, Swansborough, Georgia Taylor, Tutt, Ungar and Webb.
Paragraphs 3 (Annual progress report for Looked After Children’s Services) and Paragraph 4 (Treasury Management Policy and Strategy)
52.7 Councillor Glazier moved the reserved paragraphs in the Cabinet’s report.
52.8 The motions were CARRIED after debate.
53. Questions from County Councillors
53.1 The following members asked questions of the Lead Cabinet Members indicated and they responded:
Questioner |
Respondent |
Subject
|
Councillor Lambert |
Councillor Claire Dowling
|
Recruitment to the Tree Officer Team
|
Councillor Lambert |
Councillor Claire Dowling |
Introduction of legislation in relation to vehicles parking on pavements
|
Councillor Osborne |
Councillor Claire Dowling
|
Update regarding introduction of enforcement powers to local authorities regarding HGV limits
|
Councillor Daniel |
Councillor Glazier |
Support for the Prime Minister
|
Councillor Robinson |
Councillor Bowdler |
Support for the SafeLives ‘Friends can Tell’ campaign
|
53.2 Fourteen written questions were received from Councillors Lambert, Field, Ungar, Georgia Taylor, Maples and Hilton for the Lead Member for Transport, the Lead Member for Adult Social Care and Health, the Lead Member for Economy and the Lead Member for Resources and Climate Change. The questions and answers are attached to these minutes. The Lead Members responded to supplementary questions.
THE CHAIRMAN DECLARED THE MEETING CLOSED AT 12.47 pm
_________________________
The reports referred to are included in the minute book
_________________________
1. Question from Emily O’Brien, Newhaven, East Sussex
A
freedom of information request shows that East Sussex County
Council recently spent over £9,000 on a series of verge
marker posts on the 'S' bends in the road on both sides of Foxhole
Farm on the A259 between Newhaven and Bishopstone.
An earlier petition requesting that the speed limit be reduced
there, to improve road safety not only to motorists but to the many
cyclists and pedestrians crossing the road at this 60mph stretch,
was refused on the grounds that not enough people had been killed
or seriously injured to make money available to
‘re-engineer’ the road to reduce speed.
It now seems that the council has acknowledged that the road is
indeed dangerous just as residents had said. In fact enough people
have now been killed or seriously injured to allow money to be
spent on it after all.
Can the Lead Member please explain then to the over 250 people who
signed that petition, plus all those who have campaigned for a
safer junction at Bishopstone yet despite endless promises are
still waiting for action, why instead of spending that money to
make the road safer, the council has instead chosen to spend
thousands of pounds on a measure which will inevitably make the
road faster - actually increasing the danger to the many
pedestrians and cyclists who use the road there.
Response by the Leader and Lead Member for Transport and Environment
In July 2019 a petition to reduce the speed limit to 40mph on the A259 between Seaford and Newhaven, enforced by speed cameras, was considered by the Lead Member for Communities and Safety.
Speed surveys undertaken on this section of the road prior to the meeting indicated that average speeds were between 42 mph and 47 mph westbound and 45 mph and 48 mph eastbound.
Previous assessments of the A and B class roads in the County had identified that the level of fatal and serious injury crashes recorded on this section of the A259 was 7.1 per 100 million vehicle kilometres. This was below the County average of 8.9 per 100 million vehicle kilometres. The crash rate (all crashes) was also calculated at 22.6 per 100 million vehicle kilometres which was below the 35 per 100 million vehicle kilometres previously recommended by the Department for Transport as a threshold above which the investigation of a lower speed limit might be appropriate.
The Lead Member therefore resolved that a 40mph speed limit on the A259 between Seaford and Newhaven was not a priority for the County Council, the location did not meet the Sussex Safer Roads Partnership criteria for speed cameras and that the Strategic Economic Infrastructure Team had recently commissioned consultants to carry out a feasibility study of possible improvements at the junctions of Bishopstone Road, Marine Parade and Hill Rise.
This feasibility study was completed in 2019/20. It identified and modelled several potential junction and accessibility improvements to address concerns about road safety and community severance between the Bishopstone Road and Hill Rise junctions. These included the introduction of traffic signals and standard roundabouts at the Bishopstone Road, Marine Parade and Hill Rise junctions as well as a gyratory incorporating the Marine Parade and Hill Rise junctions.
The findings of the study indicated that, apart from the introduction of a gyratory, it would not be possible to formalise the current situation without creating significant and potentially unacceptable delays on the A259. However, the introduction of a gyratory would potentially require land acquisition and be prohibitively expensive to implement.
A Notice of Motion, considered by the Lead Member for Transport and Environment in February 2021, requested that a study was undertaken, and proposals developed, to improve road safety for car users, cyclists and pedestrians at all junctions with the A259 in Seaford. At this meeting it was resolved to recommend that Full Council did not support the motion as two further studies were already underway to consider these issues.
The Transport for the South East’s Outer Orbital Corridor Study will consider strategic and regionally significant interventions on the A259 corridor. The County Council led A259 South Coast Road corridor study will identify, using appropriate evidence, more localised interventions for pedestrians, cyclists, public transport users as well as congestion and safety measures along the corridor.
Both studies will enable business cases to be drawn up that assist in the development of bids to central government for specific funding to be allocated to this route.
As the local Highway Authority, the County Council has a statutory duty to identify crashes occurring on our road network and put in place a programme of works to address these crashes. To discharge this duty, we use crash data provided by Sussex Police, recorded in line with Department for Transport requirements to identify sites where four or more personal injury crashes have occurred in the previous three years. This criterion has been in use for more than 20 years and regularly identifies 60 to 80 sites that require further investigation.
We have limited funding for road safety interventions, and it is important that we target this funding to sites that will produce the biggest impact in terms of casualty reduction.
We give priority to sites that have the most personal injury crashes, especially those involving fatalities or serious injury. In 2020, we looked at crashes between 1 January 2017 and 31 December 2019 and identified 75 sites with four or more personal injury crashes. The Foxhole Farm site was ranked 36 out of the 75 sites.
A detailed study of the descriptions and causes of the crashes occurring at this location suggested that, to help reduce the number of casualties, it would be appropriate to introduce a series of verge marker posts on the bends on both sides of Foxhole Farm, to help advise drivers of the road alignment.
The vegetation cutting was carried out as part of our cyclic maintenance contract with East Sussex Highways, and the cost of installing the verge marker posts was £9,205. This type of scheme is typical of the localised interventions undertaken by the Road Safety Team as part of their annual programme of work.
WRITTEN QUESTIONS PURSUANT TO STANDING ORDER 44
1. Question by Councillor Lambert to the Lead Member for Transport and Environment
Access groups in Eastbourne, Seaford and Newhaven have requested me to ask these questions on their behalf:
1. What was the budget for the previous year for the provision of dropped kerbs?
2. Was it spent? And if so, where was it spent?
3. If it wasn't spent, is it still available to be added on to this year's budget?
4. What is this year’s dropped kerb budget? And where and when will it be spent?
Answer by the Lead Member for Lead Member for Transport and Environment
Following reports to Economy, Transport and Environment Scrutiny Committee in 2017 and Place Scrutiny Committee in 2018 on the County Council’s dropped kerb policy, £50,000 has been allocated in the County Council’s capital programme of local transport improvements since 2018/19 towards delivering measures to support accessibility, including dropped kerbs.
Applications requesting dropped kerbs are submitted via the East Sussex Highways website to our Highways team who will assess and prioritise these requests on a number of factors including:
· Is there a dropped kerb located on only one side of the road?
· Are there issues associated with illegal parking?
· Are there issues with speed of traffic, congestion, reduced sight lines?
· Where is the location?
· Is it near a bus stop?
· Is it located on main pedestrian routes within towns and other settlements with larger centres of populations to support the local community and visitors?
Turning to the question received by the access groups via Councillor Lambert, a total of £72,000 was spent on dropped kerbs/tactile paving in 2020/21; an additional £22,000 over the original allocation in that year’s programme in response to the number of requests we received. This enabled us to install 41 dropped kerbs across Hastings, Burwash, Eastbourne, Seaford and Forest Row.
In 2021/22, an allocation of £50,000 is available. To date, 14 dropped kerbs have been installed so far across Hastings, Eastbourne, Heathfield, Bexhill. Up to a further 13 dropped kerbs are planned for installation by the end of the financial year within Alfriston, Peacehaven and Newhaven.
In addition to this dedicated funding, dropped kerbs and tactile paving to improve accessibility are integrated into the wider transport schemes that are delivered by the County Council through its capital programme of local transport improvements. These wider transport schemes are funded through a range of sources including our own capital programme allocation, Local Growth funding through the Local Enterprise Partnership, development contributions and other grant funding we have bid for.
Furthermore, we have also been able to use the tranche 2 funding from the Emergency Active Travel Fund to deliver pedestrian improvements, including dropped kerbs, on key routes across Bexhill, Hastings, Lewes and Newhaven identified through the evidence base in our Local Cycling and Walking Infrastructure Plan.
Finally, through the planning process, we request for dropped kerbs and tactile paving to be provided by developers in the vicinity of their site as part of their off-site improvements.
Therefore, through a number of means we are introducing dropped kerbs and tactile paving across the county to improve accessibility for all.
2. Question by Councillor Field to the Lead Member for Adult Social Care and Health
What preparations are being made to accommodate the increased number Adult Social Care assessments which will be needed as a result of recent legislation?
Answer by the Lead Member for Adult Social Care and Health
In preparation for the changes that come into force in October 2023, as well as using information and tools from the Department of Health and Social Care, Office for National Statistics and the Association of Directors of Adult Social Services, the department is developing a modelling tool to estimate the additional activity that is likely to be generated.
This tool will take into account an estimate of the number of individuals who currently fund their own care and the potential increase in this number when the threshold for local authority support increases from £23,250 to £100,000. It is anticipated that there will be significant demand from people who already fund their own care in Summer 2023 to have their care accounts created in time for the start of the new process in October 2023.
Much of this information is not currently available and when there is confidence in the volume and profile of the estimated additional activity, this will be converted into the estimated staffing requirements to meet the additional demand. This will include areas such as social care and financial assessments, complaints, brokerage and creating and maintaining care accounts.
These estimates will take into account the principles of:
Once these estimates have been completed, any additional resource requirement will be considered through the Reconciling Policy, Performance and Resources process, including the use of the specific government grant allocated for social care reform.
3. Question by Councillor Field to the Lead Member for Transport and Environment
What is the plan to use lamp columns for Electric Vehicle charging?
Answer by the Lead Member for Transport and Environment
ESCC is currently working with its partners in SPACES (Strategic Property Asset Collaboration in East Sussex) to develop a prioritised list of sites for the location of publicly-accessible electric vehicle charge points in the county. Once this list has been established we will need to address a number of factors, including the appropriate type of EV charge points, the availability of power and so on. As part of this process, one of the considerations will be whether to install EV charge points on existing street lighting columns. This is not always practical, for instance where street lighting columns are at the back of the pavement, don’t have the correct wiring or are heritage columns.
4. Question by Councillor Ungar to the Lead Member for Adult Social Care and Health
How many, if any, people in East Sussex have at the moment and over each of the last 4 years by month, “unallocated” or unsourced hours of home care, meaning they are not getting the home care they have been assessed as needing?
Answer by the Lead Member for Adult Social Care and Health
The information requested was not routinely collected prior to April 2019. However, for the two year period prior April 2019, independent sector supply closely met adult social care demand for services.
The table below covers the period April 2019 to January 2022 shows homecare packages actively sought by the department’s service placement team and, as such, includes clients who are have their immediate care and support needs met by another means (eg: self-funding, residential care, unpaid carers, direct payments) as well as those already in receipt of a homecare package, but requiring an increase or requesting a change of provider.
From April 2019 to July 2021, independent sector supply closely met adult social care demand for services, with the exception of a couple of spikes resulting in a relatively small number of packages experiencing short delays.
Three factors contributed to the significant change in the capacity position in June 2021, as follows:
- A significant increase in demand over the Covid period for homecare services resulting in a sustained 20% increase in requests for homecare provision.
- Increased and on-going infection amongst care workers leading to a capacity deficit due to staff absenteeism.
- The reduction in the number of overseas workers in markets competitive to care (e.g. retail, hospitality) resulted in very significant recruitment issues across the care sector as potential carers opted to work in alternative roles to social care.
5. Question by Councillor Ungar to the Lead Member for Adult Social Care and Health
What is the current waiting time for someone to receive a home care package?
Answer by the Lead Member for Adult Social Care and Health
This information is not currently routinely collected but work is planned to amend the department’s client information system to programmatically capture this information in the future.
A manual calculation for December 2021 shows an average waiting time of eight days. Whilst this average figure includes packages of care in both urban and rural areas, it is important to note that some people with the most complex and geographically challenging packages may wait considerably longer and have their care and support needs temporarily met by other means until the package of care is successfully sourced.
Since March 2020 ASC has had in place block contract arrangements exclusively for the purposes of hospital discharge; this enables a dedicated hospital broker to prioritise hospital cases.
Emergencies and placement breakdown are identified as priorities, and are treated as such, bearing in mind that these cases are likely to be clients in receipt of services and potentially with a limited wider network of support.
Community cases are subject to triaging and are prioritised on the basis of complexity and consideration of support networks already in place.
In an urgent situation and in the event of homecare being unavailable, a client will be offered an alternative service provision to meet their assessed needs e.g. respite placement
The above approach of prioritisation and risk management ensures that those with the greatest need receive the support when required (ie: same day, within one week, etc.).
6. Question by Councillor Ungar to the Lead Member for Adult Social Care and Health
How long are people having to wait to have a full Social Care Assessment now and for each month for the last 4 years?
Answer by the Lead Member for Adult Social Care and Health
The prioritisation of assessments is based upon an individual’s level of presenting risk and setting (ie. hospital, home or care home) and all individuals are screened at the point of contact to ensure that immediate needs are met and any risk is managed, prior to a full Care Act assessment being completed.
Approximately two thirds of people receive an assessment within 30 days of contact (27% within 48 hours) and this figure increases to approximately 85% within 60 days.
The table below shows the average length of time between initial contact and assessment each month for the past four years:
7. Question by Councillor Ungar to the Lead Member for Adult Social Care and Health
How long does it take for someone to have funding agreed for their care package from the time of the assessment to the agreement of that funding?
Answer by the Lead Member for Adult Social Care and Health
Funding is agreed immediately following the completion of the assessment process (ie: social care assessment, client agreement to the support plan and quality check).
8. Question by Councillor Ungar to the Lead Member for Adult Social Care and Health
How many people have had their discharge from each hospital in East Sussex delayed because of Social Service issues? Example awaiting a care package to be provided or a place with community re-enablement month by month over the last 4 years?
Answer by the Lead Member for Adult Social Care and Health
The Department of Health and Social Care ceased collecting data on delayed discharges at the start of the pandemic in March 2020.
Since that date, all hospital discharges have been initially funded by the NHS, through the Hospital Discharge Programme, and the system has collectively focused on the timely transfer of patients as soon as they become Medically Ready for Discharge (ie earlier in their hospital stay), using a Discharge to Assess model, and does not attribute causes to any organisaton or sector.
The table below includes all East Sussex residents (including those delayed in hospitals outside the County) and provides information on the average number of delays attributable to Adult Social Care, both in terms of absolute numbers and per 100,000 adult population (the previous national indicator) for each month between January 2018 and February 2020:
9. Question by Councillor Georgia Taylor to the Lead Member for Transport and Environment
There is a Waste Strategy that commits to reducing the production of waste and to recycling and re-use in East Sussex. Please can you tell me of any initiatives in process or planned to reduce the amount of waste that is produced in East Sussex? Are there any current initiatives to increase and encourage localised re-cycling, upcycling and re-use? Lewes District is the only District Council to undertake food composting; how are other Councils being encouraged to follow suit and are there plans for local food waste energy production (e.g. How Anaerobic Digestion Turns Food Waste Into Energy - Willshee's (willshees.co.uk))?
Answer by the Lead Member for Transport and Environment
East Sussex County Council and all five districts and boroughs produced a joint waste strategy for 2014-2025. We plan to review and update the document when the detailed requirements of the Environment Act are fully understood.
Locally, most East Sussex collection authorities collect refuse on a fortnightly basis. This is proven to reduce residual waste and helps to encourage our residents to make the most of the range of recycling services that East Sussex County Council and our districts and boroughs offer.
Eastbourne Borough Council switched from weekly refuse collection to fortnightly last year which has reduced waste collected and increased recycling.
Nationally and from 2023 onwards, government will be implementing three major changes to how waste and recycling is managed.
1. Extended Producer Responsibility (EPR) – producers of packaging waste will become responsible for the cost of collecting and treating this waste. This will cause a significant change in how products are manufactured, how much is placed on the market and what these products are made of.
2. Deposit Return Scheme (DRS) – producers of beverage containers will become responsible for the cost of collecting and treating this waste. Residents will also pay a deposit when they purchase a beverage to incentivise them to recycle it.
3. Consistent collections –local authorities will have to collect a set range of recyclable materials and from 2025 provide separate weekly food waste collections for all residents. East Sussex County Council already provides an In-Vessel Composting (IVC) facility at Whitesmith which produces high quality compost using garden waste and food waste collected from our residents.
These are once in a generation changes to waste services and the waste team at the County Council is currently working with partners to prepare for them.
Over the last two years, the County Council has
· delivered recycling leaflets to all residents
· delivered a countywide campaign to increase battery awareness and recycling
· supported three of the district and borough councils to introduce kerbside recycling of small electrical equipment.
We have reuse shops at all 10 of our Household Waste Recycling Sites (HWRS) where residents can deposit and buy items that are suitable for reuse. Over 600 tonnes of unwanted household items are reused in this way each year. We have very recently improved and enlarged the reuse shop at our Eastbourne site.
We also support local reuse charities by providing them with a permit for free disposal of furniture that they are unable resell through their shops. This includes some of the biggest charities in the reuse sector such as Age UK, British Heart Foundation and Furniture Now. This support is important to their work and has ensured that thousands of tonnes of items from households in East Sussex have been put to good use again.
Currently the decision whether to collect food waste is a matter for the individual collection authorities. That is about to change under the Environment Act 2021 that will require all collection authorities in England to provide food waste collections by 2025. The County Council in partnership with Brighton & Hove City Council and Veolia has built the Woodlands composting plant which is operating and available for food waste that our districts and borough councils collect. Currently, food waste that is separately collected by Lewes District Council goes for composting at Woodlands and produces a high-quality compost soil improver. Food waste present in black bags or black bins is treated at Newhaven Energy Recovery Facility (ERF) and is used to generate electricity.
As we have Woodlands IVC, there are no current plans to develop any other method of food waste energy production.
We have also facilitated the provision of over 35,000 home composters to residents over the last 20 years to help reduce the amount of garden waste that councils are asked to collect and dispose of.
10. Question by Councillor Maples to the Lead Member for Transport and Environment
There has been a huge number of incidents where sewage has been released into rivers and the sea in East Sussex by Southern Water. And even when fines are given, Southern Water doesn’t improve their practice. Is ESCC taking any action on this issue? Are there any discussions taking place? What strategies could be developed to engage with Southern Water to make sure they start taking residents’ concerns seriously? How can Councillors help? When will the Surface Water Management Plans be updated?
Answer by the Lead Member for Transport and Environment
The County Council does not have any statutory powers or duties to address matters of water pollution or the continued use by water companies of combined sewer overflows. The matter is a national issue and will require significant investment over the long term to improve the quality of our rivers and streams. The primary vehicle for this change is the regulatory and financial framework set by both government and Ofwat. But clearly the Environment Agency has a key role in enforcing current regulations when it comes to the pollution of water bodies.
The County Council therefore does not have a substantive role in managing this issue, it is not part of our statutory obligations. Nevertheless, we do have opportunities to influence and facilitate change in very specific circumstances. We have worked with Southern Water, for example, to develop options to bring the Bourne Stream in Eastbourne back into use for surface water drainage.
The County Council is leading the Blue Heart project which aims to develop innovative flood risk mitigation measures for Southern Wealden and Eastbourne. This six year £4.5m project will develop an integrated approach to water management in the project’s catchment using real time flood modelling informed by data collected by thousands of monitoring points located on assets operated by Southern Water, the Environment Agency, the Pevensey & Cuckmere Water Level Management Board and the local authorities. One of the outputs of the project is to better manage surface water and use existing assets to their best effect. In the context of foul water pollution this means removing surface water from the foul network to create more capacity.
The County’s Surface Water Management Plans (SWMPs) were developed prior to the most recent climate projections, although the mapping that supported the plans has yet to be updated because we are awaiting the outcome of the Environment Agency’s National Flood Risk Assessment. It would not be advisable to update the SWMPs until that work has been completed.
11. Question by Councillor Georgia Taylor to the Lead Member for Economy
How is the council supporting and incentivising local skills and SMEs to deliver a widespread housing retrofit programme. Has the council considered Energiesprong type retrofit, or any other types? What kind of public investment could be provided by the Council, e.g. supporting investment in a factory facility in East Sussex to deliver the units needed for Energiesprong retrofit, which would also deliver significant local jobs?
Answer by the Lead Member for Economy
In response to how the council is supporting and incentivising skills and SME’s - We are aware that there is a significant shortage of retrofitters nationally at the current time, and are working closely with East Sussex College Group, through our Net Zero Skills Working Group to address these skills gaps. The College has recently accessed funding from the government’s Skills Development Fund to established two Decarbonisation facilities, where 15 new courses to support Net Zero skills, including retrofitting, will be developed and taught from the Eastbourne and the Hastings campus
In response to what public investment and support can be provided - The County Council provides capital grants of up to £25,000 and loans of up to £200,000 to help businesses create jobs through its East Sussex Invest 7 (ESI 7) programme. In addition, the county council together with our district and borough partners, fund the Locate Inward Investment service which is able to help investors find property and apply for other sources of funding, including via the South East Business Boost (SEBB) grants programme which we run in partnership with Southend Borough and Kent County Councils. SEBB offers growth grants up to £10k to help businesses create jobs, expand and introduce new products & services. If Cllr Taylor has a particular business in mind now or in the future, then I would be very happy to make the appropriate introductions.
12. Question by Councillor Hilton to the Lead Member for Resources and Climate Change
What is the Lead Member’s response to the Council Climate Scorecards? ESCC is number 14 in a list of 24 County Councils, and scored particularly badly on mitigation and adaptation. Council Climate Plan Scorecards | Climate Emergency UK (councilclimatescorecards.uk) Please can you tell us how the Council will urgently improve action on both mitigation and adaptation. Will the council be using the useful Climate Plan Action Plan checklist created by Ashden and used as part of the assessment process to update and improve the rigour of the ESCC climate Action plan?
Answer by the Lead Member for Resources and Climate Change
Climate Emergency UK is a small voluntary group that has recently undertaken a scoring exercise of all UK Local Authority climate & ecological emergency declarations and action plans. This process began in September last year, so fails to take into account the County Council’s commitment of a further £3.8m to reduce corporate carbon emissions that Cabinet agreed in November last year or the publication of the East Sussex Climate Emergency Road Map, which the County Council developed with its partners in the East Sussex Environment Board and which was endorsed by Team East Sussex last month. The scoring also doesn’t tell you that the County Council is involved in a range of formal and informal networks and fora with other local authorities, as well as the wider public and private sector, to exchange information on good practice, for instance on modelling for net zero, EV charging, carbon off-setting and carbon literacy. We will use this learning to inform the development of the next stage of our corporate climate emergency plan.
13. Question by Councillor Lambert to the Lead Member for Transport and Environment
On February and March 2021 the Lead Member for Transport and Environment and Council considered a Notice of Motion from Councillor Darren Grover and I calling for a study to be undertaken and proposals to be developed to improve road safety for car users, cyclists and pedestrians at all junctions with the A259 in Seaford. The Notice of Motion further called for lower speed limits to be imposed and enforced on the approaches to Seaford and for safer crossing points to be introduced at key points on the A259 including at the Bishopstone junctions.
The Notice of Motion was turned down but the Lead Member for Communities and Safety asserted that the County Council was carrying out a pilot scheme to change driver behaviour as he believed that this was a significant contributory factor in accidents across the county.
What progress has been made on this initiative?
Answer by the Lead Member for Lead Member for Transport and Environment
A report which provided an update on the East Sussex Road Safety Programme, was considered by Place Scrutiny Committee on the 26 November 2021. The report and appendices can be found at the following link Agenda for Place Scrutiny Committee on Friday, 26th November, 2021, 10.30 am | East Sussex County Council
14. Question by Councillor Lambert to the Lead Member for Transport and Environment
A workshop to consider the study of the A259 was held on 25 January 2022. Workshop members were split into groups but were given only one hour to consider over 70 proposed projects which had been presented to them that morning at the workshop.
Does the Lead Member consider that this is a satisfactory way to carry out a consultation on this major initiative and if so why?
Answer by the Lead Member for Lead Member for Transport and Environment
In 2019 Transport for the South East identified that the A259 South Coast Road Corridor between the eastern edge of Eastbourne to the edge of Brighton as one of the ten high-priority Major Road Network schemes across its geography; the Major Road Network being the most economically important A roads managed by local authorities.
A study was commissioned last year with the overarching aim of identifying a preferred package of multi-modal improvements for this section of the A259, which supported the delivery of the Government’s Major Road Network objectives as well as reflecting the increasing need to decarbonise transport alongside the Government’s Bus Back Better and Gear Change strategies. In turn, the study outcomes will then inform the development of a Strategic Outline Business Case ready for submission to Government in Spring 2022, as the first stage in making the case for investment in the corridor.
Stakeholder engagement and seeking local views is always going to be important in undertaking a study of this magnitude. The first in a series of stakeholder workshops were carried out in October 2021, a second in January 2022 with a final set of workshops planned for spring 2022. The workshops have been structured to ensure that stakeholder groups and community representatives, as well as planning, transport, and environmental interest groups, can contribute their views at key points in the study programme on the evidence base, the potential list of interventions and the assessment of the identified preferred package of improvements.
The aim of the most recent set of workshops in January was to firstly reacquaint stakeholders with the scope of the study, the work programme, timescales, and the outcomes from the initial set of workshops. Stakeholders were then asked to participate in facilitated breakout sessions to help aid the prioritisation of a long list of schemes which were identified through the discussions with stakeholders during the initial set of workshops in October 2021.
This approach, which has worked successfully on other studies, has ensured that the A259 South Coast Corridor project team were able to capture the stakeholder views on the current long list of schemes, ensuring they are reflective of the challenges and needs of local communities, which will then help the next stage of sifting, testing and designing of the preferred package of measures to be put forward in the Strategic Outline Business Case for the A259 South Coast Corridor.
In addition to the workshops, the project team has continued to encourage and provide opportunities for key stakeholders to communicate, including via online survey methods, to ensure we have captured all the required information to support the study. Stakeholders have been provided with a contact email address for the Study project team, and were asked at the January workshops to provide any further comments or feedback on the long list of priorities that were discussed via email.
Following collation of the feedback at this stage, notes from the workshop will be provided to attendees and the A259 project team will be in contact with the dates for the third stage of stakeholder workshops and engagement, currently estimated to be held in March/April 2022.